SAATATYA LABS
Enquiry

Case study · US Enterprise

Forty solutions became one pipeline.

A US manufacturing enterprise ran its factory software as about forty hand-built Visual Studio solutions, deployed by copying files to servers. We consolidated the estate and gave it real pipelines, signed installers, and gated database deploys.

Delivered · CI/CD.NET FrameworkAzure DevOpsSQL Server + SSDTWiX + Authenticode

70

Projects, one solution

1,787

Source files

1,474

Database objects

18

Data layers

Station 01 · The estate

Built by hand, shipped by copy.

About forty separate Visual Studio solutions, one per factory tool, each built by hand and copied to servers. Versions drifted, hotfixes overwrote work, and nobody could say which build was actually running on which machine.

before · release ritual
BUILDCOPYHOTFIXDRIFT← every release
Legacy .NET estate

Station 02 · The consolidation

One solution to build them all.

Seventy projects now live in one master solution with shared build rules, one output folder and vendor libraries resolved in one place. Nothing was rewritten. The estate was made buildable, which is what unlocked everything after.

estate · consolidated
70 PROJECTSSHARED RULESVENDOR LIBSONE OUTPUT
Monorepo, zero rewrites

Station 03 · The pipeline

Push, and the factory suite ships.

Azure DevOps regenerates the data layers, builds all seventy projects, signs every binary and the installer with the company certificate, packages an MSI and tags the release. What was a manual ritual happens on every push.

pipeline · azure devops
$ git push → pipeline
→ regenerate 18 data layers
→ build 70 projects
✓ binaries + MSI signed
✓ artifact published + tagged
Signed, versioned, repeatable

Station 04 · The database

Schema changes with a paper trail.

Fourteen hundred database objects build into a dacpac. Every change produces a read-only deploy plan first, and publishing to an environment is gated behind an approval, with data-loss protection on.

db · deploy plan
DB OBJECTS 1,474PLAN READ-ONLYDEPLOY GATED
Gated deploys

Station 05 · Delivered

Their team runs it now.

The pipelines, the installer and the branching model were handed over with documentation and engineering training. The client's own team operates the system today. Delivered, in the fullest sense.

handover · complete
$ handover --status
✓ app pipeline in production
✓ database pipeline gated
✓ handbook + training delivered
→ operated by the client's team
Delivered · trained

System map · verified

The architecture, on paper.

Engineers

Engineer workstation

git push · schema changes

Pipelines

App pipeline

build · sign · MSI

DB pipeline

dacpac · deploy plan

Targets

Artifact feed

signed MSI · tagged

SQL Server

approval-gated publish

Outside

DigiCert

timestamping

Arrived. Now let's chart yours.

Every client gets a new flight path. Bring us the destination and we will engineer the route.